- Thread starter
- #141
majorcatfish
Garden Master
don't know why but got a hair up my butt this morning to start redesigning the germination table, taking it from version 2.0 to 3.0
removed the t-5 and t-12 lighting, carefully removed all the plastic. did a quick list of what i needed from lowes got everything i needed....
returned home went out to the barn to get the screws... not a drywall screw out there.. off to tractor supply..
started by move supports around so i could move the upper tier up 5 ", well heck have a twisted upright, replaced it, all good able to cut out the twist<well in my mind>
and use the it for a cross member for the lower tier...
rebuilt the upper tier made sure that the cross members were level plus added 2"x2" 45* for rigidity..
moved the side cross members for the 2nd tier lighting.. that was easy.. well heck both boards i was going to use way to twisted to use, off to lowes in the morning to finish the rebuild ..
so here is where i am in this project..
now have a 2nd t-5 high bay just need to wire it ....
still have a couple more weekends to finish this project... will keep you posted....
with this expansion will be able to do 8 trays of seedlings.... and still be able to store junk in the off season
removed the t-5 and t-12 lighting, carefully removed all the plastic. did a quick list of what i needed from lowes got everything i needed....
returned home went out to the barn to get the screws... not a drywall screw out there.. off to tractor supply..
started by move supports around so i could move the upper tier up 5 ", well heck have a twisted upright, replaced it, all good able to cut out the twist<well in my mind>
and use the it for a cross member for the lower tier...
rebuilt the upper tier made sure that the cross members were level plus added 2"x2" 45* for rigidity..
moved the side cross members for the 2nd tier lighting.. that was easy.. well heck both boards i was going to use way to twisted to use, off to lowes in the morning to finish the rebuild ..
so here is where i am in this project..
now have a 2nd t-5 high bay just need to wire it ....
still have a couple more weekends to finish this project... will keep you posted....
with this expansion will be able to do 8 trays of seedlings.... and still be able to store junk in the off season