where to start on this trip...
Tuesday....
6:30 am the shuttle driver was waiting on me up in conover, unloaded my stuff off he went.
7 am walked around the building crap from the old owner was still everywhere.
8 am a crew came in removed the old stacks from the roof, woo there sports you need to take out the lower parts too, nope. got on the phone with the owner 9am the lower parts are being removed.
9:15 am on the phone with my roofer he will be there wed to seal up the curbs on the roof.
9:30 am the g/m of the store comes by, your temps will be here at 10 am.. and by the way you got the last hotel room in the area 2 conventions going on in the area.
165.00 for the night
10:25 am 3 of the 4 temps showed up put them to work.
11:30 am another crew came in and finished removing all the remaining equipment....ok now i can get to work
from 11:30 am till 6 pm..
started pulling out all the remaining old electrical wiring and gas lines that i was unable to get to before.
6:30 pm checked in to La Quinta Inns & Suites in hickory dang a 2 room suite cleaned up and walked over to Mexican restaurant, damn that was good food
Wednesday....
6:00 am went to breakfast holy cow..... real eggs,real sausage, real biscuits and gravy...first class
7:00 am got to work made my plans for the day.
7:15 am the owner calls he wants the roofs to remove all the curbs from the stacks and make the roof flat.... 360* from what he told me weeks earlier.
7:30 am my roofer showers up and explained to him the changes, <you know this changes the price> i dont give sh*t. spent the next hour finding a place that had metal roof decking.
in the mean time got the temps to work drove to the metal place found the decking....cash only $531.43 out of my pocket<thank god for 3 1st place wins in the company nascar pool> give him a p.o. to use at abc roofing supplies for the rest.
9:am the owner shows up spent the next 2 hours writing down every thing he wants done, finally told him , theres no way in hell that can be done in 4 days, <i know you will be up here next week as well><really>
10:am another temp shows up put them to work...
after lunch had the 2 brothers start blowing all everything<yes everything was still covered in sawdust>
yes we swept that floor 3 times.
5:00 pm had enough checked into sleeps inn cleaned up and had dinner at cracker barrel..
my roofers left they repaired 4 of 9 holes had them cover the rest with plastic.
heck yes we are making some serious headway
Thursday....
6:30am what a nasty as* breakfast fo eggs,fo sausage all thing good was the apples.
7:00 am planed for the day
8:00 am 2 of the 4 temps show up.. they spent the whole day blowing down the ceiling.
9:00 am the other 2 show up....give them their walking papers.
10:am started to remove all the old light fixtures....omg who ever the electrician was did not know his wiring, all the lights were 277 vac and they used low a/c voltage wire.
120 avc positive is black,red,blue , white neutral
they were using the same colors in 277 vac which is brown, yellow,orange, gray neutral.... damn going to have to rewire the whole building.
friday....
8:00am my 2 helpers finished blowing down the ceiling.
11:00 am we switched to pressure washing the walls
5:00 pm i called it
this tueday we will pick it up again....
Tuesday....
6:30 am the shuttle driver was waiting on me up in conover, unloaded my stuff off he went.
7 am walked around the building crap from the old owner was still everywhere.
8 am a crew came in removed the old stacks from the roof, woo there sports you need to take out the lower parts too, nope. got on the phone with the owner 9am the lower parts are being removed.
9:15 am on the phone with my roofer he will be there wed to seal up the curbs on the roof.
9:30 am the g/m of the store comes by, your temps will be here at 10 am.. and by the way you got the last hotel room in the area 2 conventions going on in the area.
165.00 for the night
10:25 am 3 of the 4 temps showed up put them to work.
11:30 am another crew came in and finished removing all the remaining equipment....ok now i can get to work
from 11:30 am till 6 pm..
started pulling out all the remaining old electrical wiring and gas lines that i was unable to get to before.
6:30 pm checked in to La Quinta Inns & Suites in hickory dang a 2 room suite cleaned up and walked over to Mexican restaurant, damn that was good food
Wednesday....
6:00 am went to breakfast holy cow..... real eggs,real sausage, real biscuits and gravy...first class
7:00 am got to work made my plans for the day.
7:15 am the owner calls he wants the roofs to remove all the curbs from the stacks and make the roof flat.... 360* from what he told me weeks earlier.
7:30 am my roofer showers up and explained to him the changes, <you know this changes the price> i dont give sh*t. spent the next hour finding a place that had metal roof decking.
in the mean time got the temps to work drove to the metal place found the decking....cash only $531.43 out of my pocket<thank god for 3 1st place wins in the company nascar pool> give him a p.o. to use at abc roofing supplies for the rest.
9:am the owner shows up spent the next 2 hours writing down every thing he wants done, finally told him , theres no way in hell that can be done in 4 days, <i know you will be up here next week as well><really>
10:am another temp shows up put them to work...
after lunch had the 2 brothers start blowing all everything<yes everything was still covered in sawdust>
yes we swept that floor 3 times.
5:00 pm had enough checked into sleeps inn cleaned up and had dinner at cracker barrel..
my roofers left they repaired 4 of 9 holes had them cover the rest with plastic.
heck yes we are making some serious headway
Thursday....
6:30am what a nasty as* breakfast fo eggs,fo sausage all thing good was the apples.
7:00 am planed for the day
8:00 am 2 of the 4 temps show up.. they spent the whole day blowing down the ceiling.
9:00 am the other 2 show up....give them their walking papers.
10:am started to remove all the old light fixtures....omg who ever the electrician was did not know his wiring, all the lights were 277 vac and they used low a/c voltage wire.
120 avc positive is black,red,blue , white neutral
they were using the same colors in 277 vac which is brown, yellow,orange, gray neutral.... damn going to have to rewire the whole building.
friday....
8:00am my 2 helpers finished blowing down the ceiling.
11:00 am we switched to pressure washing the walls
5:00 pm i called it
this tueday we will pick it up again....